Tutorial 20241116_2257
Here we've plotted a dataset with TSB, or the Time Series Browse capability. Changing the time will load more data.
The hidden time range control is in the 'context' property of the plot. The macro %{PLOT_CONTEXT} is used to show it.
Copy plots down will copy the plot, and correctly connect the TSB capabilty of the lower plot as well.
Advancing dom.timeRange loads data for the next day.
Setting dom.timeRange to a partial day loads just the data within the interval.
Setting dom.timeRange to cross a day boundary loads two partial days.